Sea Wall Protection at Old Leigh
This demanding contract required the removal by shotblasting of the rust caused by accelerated salt water corrosion. Steel plates were welded over the holes in the piles.
The newly prepared piles were then treated with a Cemprotech E90 specialised coating. This will
extend the life of the piles by 20 years.
Basildon District Council
Office Refurbishment
Undertook & completed a complete refurbishment of all the Offices in the main council buildings.
The works included new partitioning to form offices, new ceilings, electrical works, redecoration & carpeting throughout.

Southend Borough Council
Engineering, Pier & Foreshore Depts. Technical Services (Sea Defense.) Leisure, Culture & Environmental.
Secured long-term preferred contractor agreement until 2009 for both departments.
London Lines Ltd
Property Services Arm - Infrastructure
Preferred Contractor. We are a 'Network Rail' accredited contractor having been accredited through their 'link-up' accreditation scheme,
with our own P.T.S qualified staff.